CONTROL DE PRODUCCION/WILLIAM VORIS
Material type:
TextPublication details: MEXICO HISPANO EUROPEAEdition: 3 TERCERA EDICDescription: 593 PISBN: - 9684100213
- TS157 V915c
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Libro de Reserva | Instituto Tecnológico de Culiacán | Sala de consulta | TS157 V915C (Browse shelf(Opens below)) | 1 | Not for loan | 30594 | ||||||||||||
| Libro General | Instituto Tecnológico de Culiacán | Sala de consulta | TS157 V915C (Browse shelf(Opens below)) | 2 | Available | 30595 |
Browsing Instituto Tecnológico de Culiacán shelves,Collection: Sala de consulta Close shelf browser (Hides shelf browser)
| TS157 P424P LA ESENCIA DE LA REINGENIERIA EN LOS PROCESOS DE NEGOCIOS/JOE PEPPARD | TS157 P424P LA ESENCIA DE LA REINGENIERIA EN LOS PROCESOS DE NEGOCIOS/JOE PEPPARD | TS157 P424P LA ESENCIA DE LA REINGENIERIA EN LOS PROCESOS DE NEGOCIOS/JOE PEPPARD | TS157 V915C CONTROL DE PRODUCCION/WILLIAM VORIS | TS157 V915C CONTROL DE PRODUCCION/WILLIAM VORIS | TS157 W6911H HOW TO IMPLEMENT LEAN MANUFACTURING | TS158 C2809M METODO DEL CAMINO CRITICO |
CONTIENE INDICE
There are no comments on this title.
Log in to your account to post a comment.