Image from Google Jackets

IMPLANTACIÓN DE MANTENIMIENTO PRODUCTIVO TOTAL AL SISTEMA DE GESTIÓN INTEGRAL DEL PROCESO TURBOGAS

By: Material type: TextPublication details: CULIACAN SINALOADescription: 70 PAGDissertation note: OPCIÓN VÌ
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
Tesis Licenciatura Instituto Tecnológico de Culiacán Tesis TESIS ING. INDUSTRIAL (Browse shelf(Opens below)) 1 Not for loan 55826

OPCIÓN VÌ

There are no comments on this title.

to post a comment.