| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Libro General | Instituto Tecnológico de Culiacán | Sala de consulta | TESIS ING. INDUSTRIAL (Browse shelf(Opens below)) | 3 | Available | 50663 | ||||||||||||
| Libro General | Instituto Tecnológico de Culiacán | Sala de consulta | TESIS ING. INDUSTRIAL (Browse shelf(Opens below)) | 2 | Available | 50687 | ||||||||||||
| Libro General | Instituto Tecnológico de Culiacán | Sala de consulta | TESIS ING. INDUSTRIAL (Browse shelf(Opens below)) | 1 | Available | 50697 |
Browsing Instituto Tecnológico de Culiacán shelves,Collection: Sala de consulta Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| TESIS ING. INDUSTRIAL AUTOGESTION Y LIDERAZGO DE LAS 5 "S" EN EL DEPARTAMENTO DE MANTENIMIENTO EN LA EMPRESA BACHOCO CULIACAN. | TESIS ING. INDUSTRIAL DISEÑO Y LANZAMIENTO DE UNA NUEVA LINEA DE ENSAMBLE | TESIS ING. INDUSTRIAL DISEÑO Y LANZAMIENTO DE UNA NUEVA LINEA DE ENSAMBLE | TESIS ING. INDUSTRIAL DISEÑO Y LANZAMIENTO DE UNA NUEVA LINEA DE ENSAMBLE | TESIS ING. INDUSTRIAL ANALISIS Y DOCUMENTACION DEL PROCESO CLAVE: CREACION DE PROTOTIPOS PARA AUDITARLO SEGUN LA NORMA ISO 9001 | TESIS ING. INDUSTRIAL REMODELACION DE PLANTA | TESIS ING. INDUSTRIAL MEJORAR EL APROVECHAMIENTO DEL TIEMPO DEL PERSONAL DE MANTENIMIENTO. |
OPCION XÌ
There are no comments on this title.
Log in to your account to post a comment.
Text